Shaping the Future of
Transportation

We are Experts in What we are Doing

Please find below a list of projects successfully accomplished by Dr. A. Rudolf 

2013 – today

Dr. Rudolf is publicly appointed and sworn assessor for tunnel ventilation and tunnel aerodynamics (IHK Konstanz)

2024

Afry AG, Switzerland. Tunnel Giswil (road, refurbishment). New train station Luzern (new railway station with 2 tunnels and station ventilation). SZU Station Zurich (rail. refurbishment, upgrade), Tunnel Les Loges (rail, construction site ventilation), Tunnel St. Maurice (road, refurbishment)

2023

Al Foj company Riyadh, Saudi-Arabia. New Transport Technologies, in particular VacTranS(TM) and SandJet(TM)

2023

Cross-ING AG, Kreuzlingen, Switzerland. Ventilation of an industrial steel handling site; remote heating grid for a local community; Design of a size optimized refrigerator;

2023 - 2024

Stadtwerke Konstanz GmbH. Ventilation / Energy Recovery of Heating Centrales, Refurbishment of Energy Centers, Heat / Power coupling, Gas heaters, Heat Pumps, Solar.

2022

DB Engineering & Consulting / Queensland Rail. Metro Brisbane. Assessment of the operational readiness with focus on operational scenarios of the Tunnel Ventilation System.

2021

DB Net. Aerodynamic Assessement of cross-sections and clearance areas in regional train networks. Technical Report

2017 – 2021

RMTC / Royal Commission for Riyadh City (RCRC). Metro Riyadh. Specialist Tunnel Ventilation. Management and control of the planning and construction by the D&B consortium BACS (lines 1 and 2) with respect to TVS.

2017 – 2021

RMTC / Royal Commission for Riyadh City (RCRC). Metro Riyadh. Specialist Tunnel Ventilation. Management and control of the planning and construction by the D&B consortium BACS (lines 1 and 2) with respect to TVS.

2017

NAGRA. Disposal sites. 2nd opinion, optimisation and assessment of ventilation planning. Swiss Cooperative for the Final Deposit of Nuclear Waste (NAGRA)

2017

State Building Office Passau. B11, Operational retrofit Riedberg tunnel and enclosure Deggendorf. Ventilation escape tunnels and stairs. State Office for Civil Works Passau

2016

ASTRA. Gotthard Road Tunnel. 16 km. GP – beginning of AP. Project manager ventilation. Realization of substantial savings

2015 – 2016

U-Bahn München. CFD study smoke propagation. 5 subway stations.

2016

Highway Authority Passau. Tunnel Deggendorf. Expert Opinion on Ventilation aspects.

2016

IBE. Slovak Road Authority. Tunnels Golo and Pletjovare. 2 road tunnels up to 0.8 km. Ventilation Engineer.

2015 – 2016

IBE. Slovak Road Authority. Tunnels Dekani, Golovec, Lucan and Valeta. 4 road tunnels up to 2.2 km. Ventilation Engineer. Detailed Design.

2015

Vienna Metro. Retrofit of several rail enclosures. Expert Opinion on Ventilation aspects.

2015

German Railways. S21 new railway line. Construction Site Ventilation Concept. Designer and Expert Opinion.

2015

Israeli Railways. A1 Line Tel-Aviv to Jerusalem. 5 tunnels up to 3.5 km and underground station. Ventilation Engineer. Concept Phase.

2015

Highway Authority Passau. Tunnel Deggendorf. Commissioning tests.

2015

BBT SA. Brenner Base tunnel. Ventilation Concept during construction. Tender Support.

2015

Arteris SA / Amberg Engineering AG. Autopista Regis-Bittencourt. Tunnels T-3 and T-4. Ventilation report. Draft Design.